Peters’ Progress

17 May 2018

ROLLING THROUGH THE ASSEMBLY HALL

We are yet a step closer to finishing our new and versatile assembly hall. The new roller conveyor arrived today in its full glory. The modular roller tracks are each 3 meters long. Combined they reach a length of 24 meters. 2 of the 8 convoys are slanted.

This investment provides the optimal use of our capacity. We can easily switch between assembly projects to work more time efficient. Thanks to the mobility of the roller conveyor, we can apply different setups and use it wherever it’s needed.

We are also able to combine multiple machines into the roller convoy setup.

Terug naar het overzicht